1 / 5
| Still deciding? Get samples of $ ! US$ 0.1/watt Order Sample |


1. New cell string layout and split J-box location to reduce the energy loss caused by shading between modules.
2. Low thermal certificates for greater energy production at high operating temperature.
3. Low cell connection power loss due to half-cell layout (120 monocrystalline pv module).



Manufacturing systems are equipped with sophisticated scheduling and dispatching capabilities, automated material handling functionality, automated manufacturing systems, and smart devices utilization.
All cells and modules must pass through a list of 48 different tests to ensure that the visual, optical, electrical, physical, and mechanical properties of the products meet high standards before reaching customers.







| Method | Type | Terms | Detail |
|---|---|---|---|
| T/T | EXW | 30% T/T in advance, the balance to be paid before dispatch | |
| FOB | 30% T/T in advance, the balance to be paid before dispatch | ||
| CIF | 30% T/T in advance, the balance to be paid against the copy of B/L | ||
| CFR (C&F) | |||
| L/C | Irrevocable L/C at sight could be accepted if amount above US $50,000.00 | ||
| Delivery Time | 7 to 10 working days after receiving advanced payment | ||
Stove Solar